My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-17_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-06-17_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:54 PM
Creation date
6/20/2016 1:00:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/17/2016
Doc Name
Adequacy Review Response
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
TR115
Email Name
JLE
DIH
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont’d Task # TTT Page 10 of 16 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Task description: Regrade Deal Diversion, TR115 <br />Site: Trapper Mine Permit Action: TR115 Permit/Job#: C1981010 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado Abbreviation: None <br />Date: 6/17/2016 County: Moffat Filename: C010-005 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D4K LGP - 4P <br />Horsepower: 84 <br />Blade Type: Power Angle Tilt <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $21.29 NA <br />Operating Cost/Hour: $24.58 100 <br />Ripper own. Cost/Hour: $1.97 NA <br />Ripper op. Cost/Hour: $0.87 50 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $87.60 <br />Total Fleet Cost/Hour: $87.60 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 631 <br />Swell factor: 1.000 <br />Loose volume: 631 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 300.0 LCY/hr <br /> <br />Materials consistency description: Compacted fill or embankment 0.9 <br /> <br />Average push gradient: 0 % <br />Average site altitude: 7,500 feet <br /> <br />Material weight: 2,550 lbs/LCY <br /> <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.)
The URL can be used to link to this page
Your browser does not support the video tag.