My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-14_INSPECTION - M2016010
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2016010
>
2016-06-14_INSPECTION - M2016010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:30 PM
Creation date
6/20/2016 12:51:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Inspection
Doc Date
6/14/2016
Doc Name
Inspection Report
From
DRMS
To
Transit Mix Concrete Co.
Inspection Date
4/28/2016
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND <br />Property Boundary <br />Permit Boundary <br />Topography (1 aft Contour) <br />Pit Crest <br />Existing Road <br />Drainage <br />Reclamation Area <br />I, Paul Kos, Colorado P.E. 40848 hereby <br />certify that this drawing was reviewed <br />by me and that the information shown <br />is complete and accurate to the best <br />of my knowledge. <br />0 LIC <br />8 <br />AMC <br />moo• l l l .`` <br />0 600 1200 1800 <br />FEET <br />lJC <br />RECEIVCD <br />CIMSIONOFI 4,N AIm <br />MININGAND ETV <br />a <br />NORWMziO" <br />T <br />C O R P O R A T I O N <br />TRANSIT MIX <br />CONCRETE COMPANY <br />Figure C-10 <br />Hitch Rack Ranch Quarry <br />Final Reclamation Phase <br />DRAWN: DATE; PROJECT NO. SCALE; <br />JDS Jan 20, 2016 591-4 As Shown <br />REVIEWER: <br />NL <br />DATE REVIEWED: <br />Feb 19, 2016 <br />DRAWING. - <br />TAT—ft Rbc-591\ 591-4-IRR-CDRMS\21,. NC M—..t\Mx Ptr,4t\ExhW C - WrkV Maps\F1q-.\ACAD\F4.. C-10-Pha Redakd. o <br />sslCin 4 <br />6,940 _ I CrA "< <br />if <br />6920 <br />rho <br />6840 . c' , . <br />s e <br />s-^ 8:80 <br />6 <br />n <br />s <br />N r <br />N <br />is <br />Oil <br />04A <br />e <br />a <br />pN <br />667 <br />6850 ........+""•...N_.„ <br />i <br />Nrrr • <br />u.rN <br />NN*rN ' <br />N <br />rAA <br />N^N <br />0 <br />ell e <br />J3 <br />s AJ. <br />s• <br />l <br />f <br />6`pJ <br />tY F <br />L <br />a <br />Cil <br />L <br />rnL <br />L <br />i 4) — <br />t <br />e° p <br />r ` O 4 sR <br />p <br />4 <br />6 <br />s <br />z <br />4 <br />0 600 1200 1800 <br />FEET <br />lJC <br />RECEIVCD <br />CIMSIONOFI 4,N AIm <br />MININGAND ETV <br />a <br />NORWMziO" <br />T <br />C O R P O R A T I O N <br />TRANSIT MIX <br />CONCRETE COMPANY <br />Figure C-10 <br />Hitch Rack Ranch Quarry <br />Final Reclamation Phase <br />DRAWN: DATE; PROJECT NO. SCALE; <br />JDS Jan 20, 2016 591-4 As Shown <br />REVIEWER: <br />NL <br />DATE REVIEWED: <br />Feb 19, 2016 <br />DRAWING. - <br />TAT—ft Rbc-591\ 591-4-IRR-CDRMS\21,. NC M—..t\Mx Ptr,4t\ExhW C - WrkV Maps\F1q-.\ACAD\F4.. C-10-Pha Redakd. o <br />Figure 4 - April 12, 2016 Inspection
The URL can be used to link to this page
Your browser does not support the video tag.