Laserfiche WebLink
PERMIT #: M-2016-010 <br />INSPECTOR’S INITIALS: AME <br />INSPECTION DATE: April 12, 2016 <br /> <br /> <br />Page 12 of 14 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Photo 15. View looking northeast from Borehole B1 drill pad located on ridge in northwestern portion of <br />proposed permit area, showing northern portion of proposed mining area (North Pit area). <br />Photo 16. View looking east from Borehole B1 drill pad located on ridge in northwestern portion of proposed <br />permit area, showing Little Turkey Creek canyon which will split the North Pit (at left) from the South Pit (at <br />right). Note portion of Little Turkey Creek Road visible at center.