My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-08_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-06-08_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:17 PM
Creation date
6/20/2016 9:04:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/8/2016
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
was constructed on the beams extending over the pit. A submersible pump, along with hosing and piping, is <br />suspended from the platform into the pit. A winch installed on the platform assists in setting the pump at the <br />desired elevation. A second pump was added to provide make-up water for Washplant Il. Control equipment for <br />this second pump was installed at the existing pump platform location <br />The water pumped from the Area I Pit can go in one of four directions, or a combination of them: l) Pit to <br />Washplant l; 2) Pit to Washplant 11; 3) Pit to mine water recycling line; and/or 4) Discharge to Foidel Creek. The <br />water pumped from the pit is piped to a de -sander, located at an old well site. From this point it is piped to one or <br />both of the washplants or piped over and tied into the existing mine water line. A line has been installed from the <br />de -sander back to the pit so that the back-flush water can be returned to the pit. The location of the lines is shown <br />on Map 24. The trenches were dug with a backhoe or trackhoe. During the excavation process suitable plant <br />growth media was removed and windrowed adjacent to the trench and then replaced on top of the sub -soils returned <br />to the trench. <br />PR 14-10 2.05-97.8 04/28/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.