My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-08_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-06-08_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:17 PM
Creation date
6/20/2016 9:04:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/8/2016
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction of the Haul Road B Driveway, to assure that the driveway does not disrupt established drainage patterns <br />in the area. <br />• Haulroad B was constructed on compacted spoil material and selected spoil material was also used as fill in low <br />areas. This is a previously disturbed area, and as such, no topsoil was available during either road construction or <br />relocation for salvage. Road construction involved removal of organic material from road foundation areas, <br />compaction of the remaining material where fills were not required (the Haulroad B relocation did not require any <br />'fill placement), and controlled placement and compaction of spoil material -for required road -fills. Lifts did not <br />exceed 36 inches in thickness, and were compacted and tested per AASHTO T-99 or similar specifications. <br />Haulroad B is surfaced with approximately 6 inches of compacted gravel or granular spoil material. <br />2C. Haulroad B Extension <br />The Haulroad B Extension, approved under MRO I-175, is a short segment of haulroad running on the southwest <br />side of Pond D and connecting Haulroad B-1 and the Refuse Pile Haulroad, as shown on Map 24, Surface <br />Facilities. This road segment was designed and constructed to the same standards as Haulroad B-1. The centerline <br />road profile for the Haulroad B Extension is included as part of the Haulroad B-1 profile, and the profile and typical <br />cross-sections are shown on Map 30, Road Profiles and Cross -Sections. During 1996, the road was upgraded <br />through placement of approximately 4 inches of Class VI base course and 6 inches of pit run gravel. <br />2D. Haulroad A (TR06-56) <br />Haulroad A was previously approved, permitted, and certified under CYCC Permit C-81-071 (formerly 179-77). <br />The original Haulroad A extended from the old west entrance (Routt County Road 27) to the road intersection east <br />of the current scoria storage area. Design information for the original Haul Road A is presented in Exhibit 250, <br />and design information and profiles for the remaining portion of the road are provided in Exhibit 49J. <br />In order to support increased over -the -road truck haulage of coal to Xcel Energy's Hayden Station and other <br />• regional coal customers, TCC upgraded and extended Haulroad A between the new truck loadout (TR06-53) and <br />Routt County Road RCR27. The west end of the new haul road connects with entrance and exit road segments, <br />constructed by Routt County Road and Bridge Department, at the edge of the existing Routt County Road and <br />Bridge right- of way for RCR27. The entrance road segment is a deceleration lane coming off of and paralleling <br />RCR27. The exit road segment crosses under RCR27 through an arch -culvert underpass, with an acceleration ramp <br />connecting the exit road segment with RCR27. In order to verify design parameters for both new road construction <br />and road reconstruction, geotechnical test borings were completed and a road design report prepared. Design <br />information and profiles for the new Haul Road A are presented in Exhibits 25W, Haulroad A - Geotechnical Road <br />Designs, and 49J, Haulroad A -Design Information; and road location is shown on Map 24, Surface Facilities and <br />Freshwater Systems. The overall road grade is less than 10 percent and no portions of the road exceed 10 percent <br />grade. <br />The new West Haulroad (Haulroad A) and associated facilities include: <br />• 1,800 feet of new and re -constructed haulroad <br />• 100 -ton truck scale with reinforced concrete foundation and wash -down pit <br />• Access ramp for clean-out of wash -down pit <br />• Drop -line from the existing adjacent powerline to provide power for the scale <br />• Buried drain -line and valving from wash -down pit to Sedimentation Pond B, and fiber-optic cable to Truck <br />Loadout Building <br />• Appropriate road signage <br />The new truck loadout and associated facilities is generally constructed within existing disturbance areas <br />(westemmost 300 feet of road required some new disturbance), so road construction resulted in minimal new <br />surface disturbance. Existing vegetation and available topsoil materials were stripped from any new disturbance <br />areas and placed in existing topsoil stockpiles. As an existing disturbance area, most disturbed area runoff was <br />already captured and controlled by the existing drainage and sediment control system, however, roadside ditches <br />TR06-55 2.05-69 07/26/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.