Laserfiche WebLink
TABLE A(continued) <br /> MONITORING SITES&FREQUENCY <br /> SURFACEFLOW MARCH-MAY <br /> CONTINGENT SAMPLING <br /> (sample only when pumping she 109 or <br /> REGULAR SAMPLING 115 is discharging,between 24 hours <br /> after the discharge begins and 36 <br /> hours after it ends) <br /> WATER WATER LAB SULFATE <br /> SITE WATER LEVEL&FIELD PARAMETERS QUALITY(see LEVEL& &LAB EC <br /> note,below) FIELD EC <br /> Foidel Creek <br /> USGS 09243800 Schedule A Once In March <br /> 8 Schedule A Once in March <br /> 14 Schedule A Once in March <br /> USGS 09243900 Schedule A Once in March <br /> Site 900A Schedule A Once in March <br /> Fish Creek <br /> 16A Schedule A Once in March Weekly <br /> 302 <br /> 27A Schedule A Once in March <br /> 1003 Schedule A Once in March Weekly Monthly <br /> SW-13 Quarterly-Flow only,fields semi-annually semiannually <br /> SW-14 Quarterly-Flow only,fields semi-annually semi-annually <br /> SW-15 Quarterly-Flow only,fields semi-annually semiannually <br /> 307 Monthly-Flow only,fields semi-annually <br /> 305 Monthly-Flow only,fields semi-annually <br /> Trout Creek <br /> 301 Monthly Once in March Weekly Monthly <br /> 69 Monthly Once in March Weekly Monthly <br /> 1005 Monthly Once in March Weekly Monthly <br /> Middle Creek <br /> 29 Schedule A Once in March Weekly Monthly <br /> Schedule A <br /> March-Monthly Note: site is frozen, <br /> Y quality ualRy sample <br /> April -Two times dunng month may be taken in April <br /> May-Monthly <br /> PR14-10 Exhibit 14-7 09117/15 <br />