Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> May 2016 Monthly Report <br /> Page 3 <br /> Table 2—May 2016 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P10 5/31/16 57.49 58.30 0.81 <br /> P11 5/31/16 41.38 41.80 0.42 <br /> P12 5/31/16 41.69 41.71 0.02 <br /> P13 5/31/16 41.00 41.34 0.34 <br /> P14 5/31/16 Dry 41.24 0.00 <br /> P15 5/31/16 40.85 41.10 0.25 <br /> Table 3 below provides the calendar year 2016 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> June 2015 199 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> August 2015 Sludge transferred from Pond#3 to drying <br /> pad. <br /> Should you have any questions or comments,please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr. Larry Fiske at(303) 837-5676. <br /> Sincerely, <br /> lio F.Madrid <br /> Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />