Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization to and from the site <br /> Site: Craig Pit Permit Action: SR01 2016 PermitlJob#: M1976027 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 4/25/2016 County: La Plata Filename: M027-003 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND IOOT) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br /> Seeder with <br /> Tractor <br /> Hydroseederwith 28.00 $65.89 $117.55 1 $183.44 $117.55 $250.00 <br /> Tractor <br /> Subtotals: $311.70 $206.22 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Subtotals: $0.00 $0.00 <br /> CIRCES Cost Estimating Software <br />