Laserfiche WebLink
6/15/2016 State.co.us Executive Branch M ail ­ Inspection r eport for New Elk Mine <br />https://m ail.google.com /mail/u/0/?ui=2&ik=e29129fcb5&view=pt&sear ch=inbox&th=15554e57ac011245&sim l=15554e57ac011245 1/1 <br />Hernandez ­ DNR, Alysha <alysha.hernandez@state.co.us> <br />Inspection report for New Elk Mine  <br />1 mes s age <br />Zuber ­ DNR, Rob <rob.z uber@state.c o.us >Wed, Jun 15, 2016 at 10:29 AM <br />To: Louis  Head <lhead@newelk c oal.com> <br />Cc: Christine Belk a <cbelka@os mre.gov >, Ron Thompson <ront homps on@newelkcoal.c om>, Aly s ha Hernandez  ­ DNR <br /><aly s ha.hernandez @st ate.co.us > <br />Louis  ­  <br />Please s ee the att ached report. I look forward to work ing with you and y our staff on dev eloping prac tical solutions  to the <br />issues  in t he report. <br />Take c are, <br />Rob <br />Rob Zuber, P.E. <br />Environmental Pr otection Sp ecialis t II <br />Coal R eg ulatory Prog ram <br />  <br />P 303.866.3567, extension 8113  |  F 303.832.8106 <br />1313 Sherman Street, R oom 215, Denver, CO  80203 <br />rob.z uber@state.c o.us  |  http://mining.s tat e.c o.us <br />INSP­REPORTC_C1981012_RDZ_06142016010559.pdf <br />2938K