My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-20_GENERAL DOCUMENTS - C1981035
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981035
>
2016-05-20_GENERAL DOCUMENTS - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:22:22 PM
Creation date
6/15/2016 9:46:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
5/20/2016
Doc Name
Citizen Complaint Federal Permit No. CO-0106A
From
Wild Earth Guardians
To
OSM
Permit Index Doc Type
General Correspondence
Email Name
DIH
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. GCC will file a water application and substitute water supply plan (SWSP) to the <br />Colorado Division of Water Resources to allow the redundant/expanded water supply and <br />the Reservoir to be used in conjunction with the Mine's operations. The application and <br />SWSP will be pursued concurrently. While the application is prepared and processed, the <br />SWSP will be requested to be in effect to provide water to the Mine. Typically, a SWSP <br />is reviewed and processed by the Division of Water Resources within 90 days of <br />submittal. The application and SWSP will be submitted no later than December 31, 2015. <br />Documents with their associated attachments that will be updated and drafted are listed <br />below: <br />1. Update GCC Energy Mine Water Supply and Demand Report (Pending) <br />2. Draft Substitute Water Supply Plan (Pending,) <br />3. Draft Decree Application for additional water (Pending) <br />3. Preliminary investigation into the Reservoir's potential location has begun. Surveying of <br />the proposed location will commence the first week of September 2015. The Reservoir <br />will be designed to satisfy the needs of Huntington and GCC as well as conform to all <br />applicable regulations. Construction is estimated to begin the winter of 2015 and be <br />completed by May 1, 2016. The Reservoir plans to be online and available for use in time <br />to collection 2016 spring run-off (if water is legally available). (Ongoing, initial site <br />evaluations completed) <br />
The URL can be used to link to this page
Your browser does not support the video tag.