My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-20_GENERAL DOCUMENTS - C1981035
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981035
>
2016-05-20_GENERAL DOCUMENTS - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:22:22 PM
Creation date
6/15/2016 9:46:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
5/20/2016
Doc Name
Citizen Complaint Federal Permit No. CO-0106A
From
Wild Earth Guardians
To
OSM
Permit Index Doc Type
General Correspondence
Email Name
DIH
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/19/2014 State.co.us Executive Branch Mail - King Coal TR -23 - Increase in Production <br />C <br />On Tue, Sep 2, 2014 at 3:53 PM, Talvitie - DNR, Marcia <marcia.talvitie@state.co.us> wrote: <br />David, <br />We received an application last week from GCC Energy for the King Coal Mine. They want to increase <br />their maximum annual production from 800,000 to 1,300,0000 tons. I am ready to call the application <br />complete, but I have a question regarding whether this change should include OSM Consultation for a <br />Mine Plan Change. This is my first such change on a federal mine (New Horizon was private), so I don't <br />know how best to proceed. <br />As you may recall, the surface facilities (portals, stack tubes, offices, scales, and so on) are all located <br />on State land, with State coal. The underground area from which they are actively producing is on Ute <br />Mountain surface, with BLM coal, and falls within the boundaries of the OSM permit area. (There is coal <br />on the State land that will be mined at some future date.) I believe GCC has already received approval <br />from APCD for the increased production - conveyors, screening, fugitive emissions from trucks. <br />I don't know whether GCC has submitted an application to OSM to revise that permit, but I will find out. <br />Any guidance you can offer will be greatly appreciated. <br />Thank you, <br />Marcia <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist II <br />Coal Regulatory Program <br />COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natur I Resourc s <br />P 970.247.1184 1 F 970.247.5104 1 C 970.903.7597 <br />DRMS - Durango Field Office <br />691 Co. Rd. 233, Suite A-2, Durango, CO 81301 <br />marcia.talvitie@state.co.us I http://mining.state.co.us <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist II <br />Coal Regulatory Program <br />ATCOLDivision of Reclamation, <br />ORADO <br />Mining and Safety <br />I Department of .Natural Resources <br />P 970.247.1184 1 F 970.247.5104 1 C 970.903.7597 <br />https://mail.google.com/maillu/O/?ui=2&ik=91 a975f658&view=pt&search=inbox&msg=1488a490e6684fb0&sirrl=1488a490e6684fb0 2i3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.