Laserfiche WebLink
6/15/2016 State.co.us Executive Branch Mail - Re: PSCM hydro monitor plan proposal <br />Items 7 - Suspend monitoring (until mining resumes) at the rest of the remaining <br />wells, except for the following. Well SGAL70 is the groundwater point of compliance <br />well in the Grassy Creek alluvium. In addition, monitoring at two bedrock wells will be <br />retained. Both these wells are in the area downgradient of the portal area. They are <br />Wadge Coal Well CW2701 and Wadge Overburden Well COV2702. <br />Item 8 - For all streams and springs, add a flow qualifier that only field parameters <br />(temperature, conductivity and pH) will be performed (that is, no lab sample) when the <br />flow is less than 1 gallon per minute. <br />Please let me know what you think of this proposal. You may email me at this <br />address, or call at 970-879-7037. <br />Thanks <br />Dennis Jones <br />Jared Ebert <br />Environmental Protection Specialist <br />COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />P 303.866.3567 ext. 8120 1 F 303.832.8106 1 <br />https://m ai l.google.com/m ai I/u/0/?ui =2&i k=e29129fcb5&view=pt&search=i nbox&th=1554f26bbd7a68d4&si m l=1554f26bbd7a68d4 4/5 <br />