My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-13_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2016-06-13_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:27 PM
Creation date
6/15/2016 6:55:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
6/13/2016
Doc Name
Adequacy Review
From
DRMS
To
Coors Energy Company
Type & Sequence
RN7
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Keenesburg Strip Mine; <br />C-1981-028; Permit Renewal 07 (RN7) <br />PROJECT IDENTIFICATION <br />Date: 8 -Jun -16 <br />User: ME <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: RN7 <br />Indirect Cost Summary <br />Overhead and Profit <br />Liability Insurance 2.02% of Direct Cost <br />Performance Bond 1.05% of Direct Cost <br />Job Superintendent cost/hour time 50% of total task hours; $74.48/hr <br />Profit 10% of Direct Cost <br />Legal - Engineering - Project Management <br />Engineering work and/or contract/bid prep; 6% of Contract <br />Reclamation Management and/or Administration; 4.5% of Contract <br />Permit C-1981-028 Site: Keenesburg Strip Mine <br />State: Colorado <br />County: Weld <br />2.02% <br />$18,761.26 <br />1.05% <br />$9,752.14 <br />281.56 <br />$20,970.59 <br />10% <br />$92,877.50 <br />TOTAL <br />$142,361.48 <br />6.00% $64,268.19 <br />4.50% $48,201.14 <br />TOTAL $112,469.33 <br />Total RN7 Site Reclamation Cost (Direct Cost + Indirect Cost) $1,183,605.84 <br />Current Liability as of June 8, 2016 $1,197,459.85 <br />Actual Surety as of June 8, 2016 $1,197,459.85 <br />Actual Surety (-) Total RN7 Site Reclamation Cost + $13,854.01 <br />JLE 2 6/8/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.