My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-03_PERMIT FILE - C1981008A (16)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-05-03_PERMIT FILE - C1981008A (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 10:05:16 AM
Creation date
6/14/2016 11:32:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
5/3/2016
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpiling and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TopsoiUSubsoil Balance (C7) <br />Mixed Topsoil <br />Lift A Topsoil <br />Lift B Topsoil <br />Zone 1 <br />0 <br />0 <br />0 <br />Zone 2 <br />0 <br />0 <br />0 <br />Zone 2A <br />0 <br />0 <br />0 <br />Zone 3 <br />0 <br />0 <br />0 <br />Zone 4 <br />N/A <br />N/A <br />N/A <br />Soil to be placed <br />0 <br />0 <br />0 <br />Already Placed <br />0 <br />0 <br />0 <br />Stockpiled' <br />0 <br />5,800 <br />4,070 <br />Soil Available <br />0 <br />5,800 <br />4,070 <br />Soil Balance <br />0 <br />5,800 <br />4,070 <br />'From Table 2.05.4(2)(d)-2 Topsoil Stockpile h►ventory <br />2Soil available minus soil to be placed. This shows that the plan can be accomplished with the soil on site, but it does not mean that there will be soil left <br />over. All soil will eventually be used for reclamation. <br />As can be seen from Table 2.05.4(2)(d)-3, there is sufficient topsoil and subsoil volume in the <br />stockpiles to complete the topsoil redistribution plan. Since stockpiled soil had rock fragments <br />removed during stripping, the recovery from stockpiles is treated as 100%. The basic calculation of <br />the topsoil required in a given zone is: <br />Topsoil Needed = Zone Area (ac) * 43,560fZ a� * Soil Thickness (in ) <br />12 nl * 27f`3yd3 <br />The size of the stockpiles is determined via detailed surveys conducted on site. All soil thicknesses <br />are designed to the nearest inch, since this is the practical measurement limit for the scale of <br />equipment used at the New Horizon Mine. <br />12.2 North of BB Road/West of 2700 Road <br />These lands include all lands north of BB Road and west of 2700 Road. As of January 2016, there is <br />approximately 110 acres that has been backfilled and topsoiled with Mixed Topsoil that covers all of <br />WFC -Benson West and about half of the WFC -Lloyd property. This area is shown on Map 2.05.4-9 <br />as Zone 5. Mixed Topsoil was placed atop of Bench 1 material in Zone 5. Some samples of the Bench <br />1 material were taken in 2008 from this area and tested; however, no additional testing will be done <br />on this material in this area. <br />January 2016 (TR -70) 2.05.4(2)(d)-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.