Laserfiche WebLink
Other System Components <br />Two existing ditches route parts of the affected area runoff to the pond. As shown on Map 1, <br />Pond 012 Area, the C7 Ditch collects the westernmost portion of the area and the C8 Ditch <br />collects portions of the eastern parts of the drainage area. Both ditches are modeled as vegetative <br />lined trapezoidal ditches with a 4 -foot bottom and 2H:1 V sideslopes, and with gradients <br />determined from field surveys, as depicted on Map 1. Several cross sections are also shown on <br />Map 1. The actual side slopes and bottom width may vary in the field, and the ditches may have <br />a flatter side slope or a wider bottom in some locations. Some reaches may be cut in rock. As <br />such, the actual ditch sections will be at least as hydraulically capable and erosion resistant as the <br />modeled template described above for the modest runoff flows described below. <br />Also presented on Map 1, in the easternmost sub -watershed that flows into Ditch C-8, are a <br />series of rip -rap lined erosion control measures. These are provided to prevent localized erosion <br />on the now completed reclaimed north facing slopes. The rip -rap sizing and channel depth <br />requirements shown on Map 1 are based on the watershed area's response to the 10 year, 24 hour <br />storm with Curve Number conservatively set at 74, notwithstanding the vegetation is now mature <br />enough to justify a Curve Number of 62. The four SEDCAD models associated with these <br />channels are presented on pages 25 though 56 in this section. <br />Pond Construction <br />Pond 012 has been designed and constructed as a largely subgrade impoundment with a low <br />(approximately 9 foot high) embankment about 40 feet long across a natural swale on the north <br />side. The details can be observed on Map 1. <br />The primary, or "service" spillway consists of an 18 -inch perforated riser connecting to an 18 - <br />inch CMP conduit under the above described low embankment. The overflow lip is at elevation <br />5611.0. There are a pair of 4 -inch diameter holes fitted with gate valves in the riser at elevation <br />5606.0. The valves are normally open, which sets the maximum normal pool at this level. The <br />pond floor is at approximate elevation 5605.1. <br />Runoff Calculation Results <br />The results of the runoff calculations are presented in the attached SEDCAD model printout. For <br />sedimentation evaluation, the system was modeled using SEDCAD for its response to a 10 year, <br />24 hour storm of 2.0 inches, and the 25 year, 24 hour storm of 2.4 inches for the spillway <br />evaluation. For continuity, the results of the modeling are presented below along with the <br />discussion of the physical dimensions and properties of the pond. <br />The volume of the below grade pond was input into the SEDCAD model, along with its spillway <br />details. The model watersheds were input as a series of sub -watersheds, each with its own <br />acreage, its own flow response parameters (slope, distance, time of concentration), and the <br />specific runoff curve number from the above table. The 10 year, 24 hour storm was then applied <br />to the composite watershed, and routed down to the sediment pond. The pond was assumed to <br />be full to the elevation of the open gate valves on the drop inlet riser pipe (elevation 5606.0) at <br />the start of the storm. It can be observed in the SEDCAD printout that the storm generates <br />runoff of 0.175 ac ft, and the pool rises only 0.11 feet during the routing of this event, to a peak <br />Attachment 2.05.3(3)-31 Revision Date: 1/08/2016 <br />Page 3 Revision No.: TR -70 <br />