My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-13_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-06-13_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:27 PM
Creation date
6/14/2016 6:59:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/13/2016
Doc Name
Response Letter to DRMS Comments & Adequacy Review No. 1
From
Trapper Mining Inc
To
DRMS
Type & Sequence
TR115
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR -115 Response Cont. <br />Page 3 of 8 <br />Original Disturbance (Open Acres) <br />2171.5 <br />Original Proposed Reclamation <br />-204.2 <br />Original Starting Disturbance, for 2014 WCB <br />1967.3 <br />Acres that were not reclaimed (of the 204.2) <br />+52.2 <br />Revised Open Acres for 2014 WCB <br />2019.5 <br />Actual acres disturbed + Proposed to 2017 <br />+101.8 <br />Current + Proposed Disturbance <br />2121.3 <br />Original 2014 WCB acres <br />-1967.3 <br />Additional Acres to add to Performance Bond <br />154.0 <br />(52.2 ac. + 101.8 ac. = 154.0 acres) <br />To estimate the cost for these additional topsoil replacement acres, the area was converted to a <br />topsoil volume (based on 12" depth) that would be placed utilizing scrapers with a fleet <br />production rate of 3565.9 LCY/Hour and a cost of $4017.46IHr. These costs were obtained from <br />the April 20, 2015 Circes estimate Task J09 Scraper haul. <br />- It appears the KLM pit disturbed area is increasing in size as a result of TR115. The <br />reclamation cost estimate Table A-11.1 in Appendix A, shows a cost for reclaiming 490.3 acres <br />for the KLM pit. Please update this table to account for the increase in acreage of the KLM pit. <br />Trappers Response: The 154.0 acres that were added to the topsoil placement in table A- <br />10.6 were included in table A-11.1 (Summary of estimated revegetation quantities and <br />costs) as well. The cost for these additional acres was calculated from the April 20, 2015 <br />Circes estimate task K12 ($516.93/acre). <br />In summary, the items discussed previously, and their respective costs, were input to a <br />cost spreadsheet that compares the current Bond Liability (from the Circes Estimate) to <br />what the updated Bond estimate would be with the additions. <br />The attached table Appendix A Amendment: TR -115 results in an increased bond liability <br />of $332,103.72 which includes "Indirect Costs". If we add this amount to the current <br />bond liability (from Circes), we arrive at the following liability for Trapper Mine: <br />July 20, 2015 Bond (Circes est. liability) $23,016,528.92 <br />Additional liability due to the listed additions: $ 332,103.72 <br />Total new liability $23,348,632.64 <br />New Building <br />Please provide details about the concrete perimeter foundation for the new building. Please <br />provide the dimensions of this foundation. <br />Please update Table A-12.1, in Appendix A to include the new proposed building. <br />Trapper Response: Designs for the blaster's building are attached as Figures I and 2, depicting <br />the building and foundation details for your reference. Appendix A will be amended with the <br />included table with updated bond calculations for the increased liability of the structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.