My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-13_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-06-13_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:27 PM
Creation date
6/14/2016 6:59:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/13/2016
Doc Name
Response Letter to DRMS Comments & Adequacy Review No. 1
From
Trapper Mining Inc
To
DRMS
Type & Sequence
TR115
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAPPER MINING INC. <br />P.O. Box 187 Craig, Colorado 81626 <br />RECEIVED <br />JUN 13 2016 <br />June 9, 2016 <br />DIVISION OF RECLAMATION <br />Ms. Tabetha Lynch MINING AND SAFETY <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Trapper Mining Inc., Permit No. C-1981-010, Technical Revision TR -115 <br />PMT and Mine Plan Updates including selected 2015 Midterm Review <br />Responses to DRMS Comments, Adequacy Review 1 <br />Dear Ms. Lynch: <br />(970) 824-4401 <br />Please accept this letter as our response to the adequacy review letter of March 30, 2016. Items <br />requiring a response have been copied below, Trapper's comments follow each as applicable. <br />Revised permit materials have been included as follows: <br />Pages; 3-13, 4-177 <br />Maps; MIOA(sheet 3), M10B(sheet 3) and M51(sheet 3) <br />App A; Appendix A Amendment: TR -115 <br />App Q; Section XVII (Ditch Designs) <br />49.7 Acres of New Topsoil Stripping Area <br />The disturbance area shown in TRI 15 extends beyond the current drainage and sediment <br />control boundary. Please submit updates to the drainage and sediment control plan including any <br />new pond designs needed for the additional disturbance area. <br />Trappers Response: Future proposed disturbance in TR -115 will be controlled with surface <br />diversions back to the west to the inactive A -Pit and existing sediment control structures. The <br />drainage and sediment control plan, Map M51, has been updated with the locations of two <br />proposed ditches. Ditch designs for the Deacon1deff vay and Deal diversion ditches are included <br />and should be inserted in Section XVII of Appendix Q. Permit table 4.8-3, page 4-177, has also <br />been updated with these new ditch designs. Trapper is currently working on permitting the <br />NPDES outfalls with CDPHE and designing ponds for the future disturbance areas beyond these <br />ditches. If the ponds cannot be permitted in a timely fashion the ditches will be constructed as <br />needed in advance of stripping. <br />The topsoil stripping areas shown in TRI 15 do not coincide with the areas presented in the <br />2015 ARR (TR116) for proposed 2016 stripping areas. Please resolve this inconsistency with the <br />most accurate information. <br />Trappers Response: Upcoming topsoil stripping is always a proposed action. This may vary <br />annually depending on production and field conditions. Map MI OB is a proposed plan presented <br />with each permit term. The stripping limits illustrated on this map are presented as such as noted <br />
The URL can be used to link to this page
Your browser does not support the video tag.