Laserfiche WebLink
COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> June 10, 2016 <br /> Kathleen G. Welt <br /> Mountain Coal Company, LLC <br /> P.O. Box 591 <br /> Somerset, CO 81434 <br /> Re: West Elk Mine(Permit No. C-1980-007) <br /> Proposed Decision-Technical Revision No. 138(TR-138) <br /> Revise MVB E6-14 and E7-1,3, &4 Locations/Eliminate Pad E6-16 <br /> Dear Ms. Welt: <br /> Enclosed you will frld the Division of Reclamation, Mining and Safety's Proposed Decision for <br /> Technical Revision No. 138 at the West Elk Mine. Notice of the proposed decision will be <br /> published in the Delta County Independent as soon as possible. The first publication will <br /> initiate the ten(10)day public comment period for the Division's decision. <br /> Documentation must be submitted to the Division demonstrating that a copy of the approved <br /> revision application was sent to the Office of Surface Mining and the Bureau of Land <br /> Management. The material should be sent within 15 days of final approval. <br /> Please refer to the Performance Bond heading on the enclosed proposed decision form. If the <br /> amount of Bond Held equals or exceeds the Revised Liability, you need not submit additional <br /> bond. However, if the Revised Liability exceeds the Bond Held, please submit additional bond <br /> or rider to your existing bond that equals or exceeds the Revised Liability. This Technical <br /> Revision must not be implemented until this proposed decision becomes final and until any <br /> required increase in bond is submitted to and approved by the Division. <br /> a� caio <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> John W. Hickenlooper, Governor I Robert W. Randall, Executive Director I Virginia Brannon, Director <br /> �1g�6 <br />