My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-10_REVISION - M2008006
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008006
>
2016-06-10_REVISION - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:28 PM
Creation date
6/10/2016 3:16:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
REVISION
Doc Date
6/10/2016
Doc Name
Notices
From
DRMS
To
various
Type & Sequence
SR1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-6- <br /> /6" 2. The Board may suspend or revoke this permit,or assess a civil penalty,upon a finding that the permittee <br /> violated the terms or conditions of this permit,the Act,the Mineral Rules and Regulations,or that information <br /> contained in the application or your permit misrepresent important material facts; <br /> I./ 3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, <br /> substantial civil penalties,to you as permittee can result; <br /> lit/ 4. Any modification to the approved mining and reclamation plan from those described in your approved <br /> application requires you to submit a permit modification and obtain approval from the Board or Office; <br /> V- 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br /> /tv 6. Upon permit issuance and prior to beginning on-site mining activity,you must post a sign at the entrance of the <br /> mine site,which shall be clearly visible from the access road,with the following information(Rule 3.1.12): <br /> a. the name of the operator, <br /> b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br /> Reclamation Board;and, <br /> c. the permit number. <br /> 7. The boundaries of the permit boundary area must be marked by monuments or other markers that are clearly <br /> visible and adequate to delineate such boundaries prior to site disturbance. <br /> 8. It is a provision of this permit that the operations will be conducted in accordance with the terms and conditions <br /> listed in your application, as well as with the provisions of the Act and the Construction Material Rules and <br /> Regulations in effect at the time the permit is issued. <br /> Annually,on the anniversary date of permit issuance,you must submit an annual fee as specified by Statute, <br /> and an annual report which includes a map describing the acreage affected and the acreage reclaimed to date(if there <br /> are changes from the previous year),any monitoring required by the Reclamation Plan to be submitted annually on <br /> the anniversary date of the permit approval. Annual fees are for the previous year a permit is held. For example,a <br /> permit with the anniversary date of July 1, 1995,the annual fee is for the period of July 1, 1994 through June 30, <br /> 1995. Failure to submit your annual fee and report by the permit anniversary date may result in a civil penalty, <br /> revocation of your permit,and forfeiture of your financial warranty. It is your responsibility,as the permittee,to <br /> continue to pay your annual fee to the Office until the Board releases you from your total reclamation responsibility. <br /> 10. For joint venture/partnership operators:the signing representative is authorized to sign this document and a <br /> power of attorney(provided by the partner(s))authorizing the signature of the representative is attached to this <br /> application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.