My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-09_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2016-06-09_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2020 11:10:59 PM
Creation date
6/10/2016 9:04:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
6/9/2016
Doc Name
Adequacy Review No. 1
From
Greg Lewicki And Associates, PLLC
To
DRMS
Type & Sequence
TR11
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gold Placer Disturbed Area Description Acreage <br /> Mining Cut Areas _ 52.4 <br /> Berm along Highway 9 2.8 <br /> ______ . .__.____-- —. _ ....--- —__...- - ..—____, __._..._-_--- __-- <br /> Prep Plant area,processing,stockpile areas 10.1 <br /> Pond 3 and 4 Area 3.60 <br /> .... _ .--- ----- -- ____. ....... <br /> Camp/Office/Fuel Storage Area 3.4 <br /> Site Roads 2.00 <br /> Total Disturbed Area 74.3 <br /> Some areas of the Gold Placer Disturbed Area have been removed (southern sediment ponds, <br /> now that Cut A performs the same task). The Mining Cut Areas category is unchanged by this <br /> technical revision. The only change to the mining cuts is their arrangement and orientation. See <br /> Map C-2. <br /> 4. The Operator committed to not exceeding a total disturbance of 34.1 acres for the gold <br /> operation under Amendment No. 5. Please confirm the total disturbance associated <br /> with the gold operation will not change as a result of redefining the mine phases. <br /> In the approved Amendment 5, the Division approved a worst case disturbed area of 62.8 <br /> acres. In that worst case scenario, 34.1 acres was the gold operation, with the remainder being <br /> the gravel operation. As shown in the Combined Permit Area table in Amendment 5, the peak <br /> gold operation is expected to be no more than 48.0 acres. This is still the case. The worst case <br /> disturbed area is also still anticipated to be 62.8 acres. <br /> S. The changes to the size of the phases are being made to account for MSHA <br /> requirements. Please specify the dimensions of the benches which will be used to <br /> minimize the height of the highwall. In addition,provide a brief description of how the <br /> benches will be constructed. <br /> The benches will be constructed by first excavating the upper bench out to the phase boundary. <br /> The depth of this bench will be approximately half of the depth to the bedrock. A second <br /> bench will then be cut to the bedrock. The bench height will average 20-30 feet based on <br /> previous excavations at the site. The berm (catch bench) left between the two benches will be <br /> height of an individual bench (20-30'). This will force the overall wall angle to be 11-1:1V or <br /> milder during excavation. <br /> 6. The Operator has proposed to change how stormwater will be managed at the site. <br /> Specifically, the Operator is proposing to remove a series of ditches and ponds. Please <br /> identify the ponds and ditches which will be eliminated. In addition, the Division <br /> requests a revised copy of the C-4 Hydrology Map, which was submitted under <br /> Amendment No. 5.The revised map should reflect the proposed changes, including the <br /> new diversion ditch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.