or large front end loaders in front of the active pit to the final graded backfill. WFC is <br />committed to salvaging and redistributing all available topsoil. As of June 2010, the only areas <br />from the original permit that still requires topsoil replacement are the haul road, the overburden <br />stockpile and some other minor areas. These areas cannot be re-topsoiled until the mine is in <br />final reclamation. <br />16.2 Topsoil Salvage Thickness -1996 Study Area <br />This study addresses the additional permit area immediately east of 27.00 Road and south of BB <br />Road, which is an area of 105.8 acres. See Map 2.04.9-1 for the boundary of this area. At the <br />conclusion of Phase 6 topsoil removal campaign (12-20-95), WFC conducted a topsoil balance <br />study for the approved permit boundary. The study included the entire New Horizon 2 mining <br />area. The remaining undisturbed acreage that topsoil will be salvaged from plus the topsoil that <br />was placed in topsoil stockpiles at the beginning of mining was taken into account. All disturbed <br />acreages were taken into account. The conclusion of this study can be seen in Table 2.04.9-6. <br />The study shows that New Horizon 2 will be topsoil deficient in Lift A of the two lift irrigated <br />pasture reclamation portion. This Lift A has typically come from the first lift of the 30C soil <br />group. To correct this shortage, WFC will substitute excess soil type 808 from the major <br />drainage directly north of Pond 007 for Lift A. During Phase 6 topsoil campaign, 2.4 feet of 808 <br />soil was removed from the drainage area and used for mixed topsoil replacement. The soil map <br />shows the 808 depth being 2.4 feet in the drainage area. There is more 808 to be salvaged. The <br />808 soil looks good and should make great Lift A material. WFC will test the remaining 808 to <br />verify its quality. As of February 2008, these areas have been fully reclaimed to the topsoil <br />thickness shown on Map 2.05.4-4. <br />Initially, it was reported that an area of approximately 6.73 acres immediately east of Mount <br />Nucla (box cut overburden stockpile) was only covered with 0.8 feet of topsoil. This was <br />incorrect. The postmine topsoil replacement map, Map 2.05.4-4 shows the actual replacement, <br />which is 18" of Lift A and 27" of Lift B. <br />16.3 Topsoil Salvage Thickness -1998/1999 Study Area <br />In 1998 WFC conducted a detailed soil survey and topsoil survey (Map 2.04.9-1) for the <br />proposed 1998/1999 mine permit expansion area. This included land to the north of BB Road <br />and west of 27.00 Road. The conclusions of this study are in Table 2.04.9-3 and 4. These tables <br />are based on the volumes for each soil type. <br />All topsoil stripping has been completed on the New Horizon Mine, therefore the soil tables <br />below are for historical reference only. <br />January 2016 (TR -70) 2.04.9-18 <br />