My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-08_GENERAL DOCUMENTS - C1981019 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-06-08_GENERAL DOCUMENTS - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:15 PM
Creation date
6/9/2016 7:23:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
6/8/2016
Doc Name
Midterm Review & Findings (MT7)
From
Zach Trujillo
To
Colowyo Coal Company
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
546
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The six unsurveyed areas shown on Map 16A are all within <br />Township 4 North Range 93 West and are basically described as <br />follows: <br />SWI/4 SW'/4 Section 15 <br />SWI/4 SWI/4 Section 22 <br />SEI/4 NEI/4 Section 28 <br />SWI/4 SEI/4 Section 28 <br />EI/2 NWI/4 Section 33 <br />WI/Z SWI/4 Section 33 <br />The additional study data will be forwarded to the Colorado Historic <br />Society for their evaluation and a determination of the proper course <br />of action required. <br />Stipulation 7 The Colowyo Coal Company shall submit a TECHNICAL revision <br />to the Division which provides an analysis of groundwater points <br />of compliance at the Colowyo Mine pursuant to Rule 4.05.13(1). <br />This analysis will be done in consultation with the Division and <br />will include a written determination of the need for groundwater <br />points of compliance at the mine. If deemed appropriate, based on <br />this analysis, Colowyo shall establish one or more points of <br />compliance for the Colowyo Mine. <br />Stipulation 10 Prior to disturbing any lands along the Wilson Creek the Colowyo <br />Coal Company shall provide the Division with a detailed analysis <br />and discussion of the alluvial valley floor (AVF) that has been <br />documented in the area. Colowyo must also provide a detailed <br />plan for the restoration of the AVF if and when it is disturbed. <br />This analysis may be in the form of a stand-alone revision or it <br />may be contained in the revision required in Stipulation 3. Any <br />revision submitted must be approved by the Division prior to any <br />disturbance. <br />Stipulation 15 Prior to disturbance of the Collom Facilities area, Colowyo must <br />reevaluate sediment control structures in accordance with Rules <br />RULES 4.05.2, 4.05.5, and 4.05.6. In particular, two areas in <br />Collom that were planned for SAE status, namely the 9.8 -acre <br />corner of the shop area and the 7.2 -acre area outside Deer Draw, <br />require an alternative plan. These areas must be removed from the <br />disturbed area or runoff from these areas must be routed to <br />Colowyo Mine <br />Permit No. C-1981-019 <br />Midterm Review No. 7 <br />June 6, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.