Laserfiche WebLink
Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5509 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />1,581.25 LCY/hr <br />6325 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.342/LCY <br />Total job time: <br />Total job cost: <br />0.00 Hours <br />$0 <br />