Laserfiche WebLink
Task description: <br />Site: Colowyo Coal Mine <br />BULLDOZER WORK <br />West Side Haul Road <br />Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 045 State <br />Date: 3/28/2016 County <br />User: JHB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DI IT - I IU <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />$194.10 NA <br />$291.79 100 <br />$0.00 0 <br />$38.89 NA <br />$524.78 <br />Colorado <br />Moffat <br />DRMS <br />Permit/Job#: C1981019 <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$2,099.10 <br />MATERIAL QUANTITIES <br />Initial Volume: 39,265 <br />Swell factor: 1.000 <br />Loose volume: 39.265 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />5% <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />2.870.3 LCY/hr <br />7,600 feet <br />lbs/LCY <br />fill or embankment 0.9 <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Abbreviation: None <br />Filename: C019-045 <br />0.900 <br />(AB.AVG ) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />