Laserfiche WebLink
Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.903 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4477 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />1,285.03 LCY/hr <br />5140.12 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.408/LCY <br />Total job time: 7.59 Hours <br />Total job cost: $15,927 <br />