Laserfiche WebLink
Payload Capacity: 14.79 <br />Truck Bed (volume) Basis: <br />LCY <br />Struck Volume: <br />12.00 <br />LCY <br />Heaped Volume: <br />18.00 <br />LCY <br />Average Volume: <br />15.00 <br />LCY <br />Adjusted Volume: <br />14.79 <br />LCY <br />Operation: <br />Final Truck Volume Based on Number of Loader Passes: 14.20 LCY <br />Loading Tool Capacity <br />Dump Target: <br />NA NA <br />(Cat HB) <br />Truck Maneuver and Dump 0.90 <br />Bucket Size Class: Large <br />Rated Capacity: <br />2.080 <br />LCY (heaped) <br />Bucket Fill Factor: <br />0.975 <br />Loose material - mixed moist aggregates (95-100%) 0.975 <br />Adjusted Capacity: <br />2.028 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 4000 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: ABOVE AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, P <br />maneuver): <br />7 passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: ABOVE AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, P <br />maneuver): <br />7 passes <br />minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />NA NA <br />(Cat HB) <br />Stockpile: <br />NA NA <br />(Cat HB) <br />Truck Ownership: <br />NA NA <br />(Cat HB) <br />Operation: <br />NA NA <br />(Cat HB) <br />Dump Target: <br />NA NA <br />(Cat HB) <br />maintained 3.0 <br />Net Cycle Time Adjustment: NA <br />minutes <br />Adjusted Loader Cycle Time: 0.234 <br />minutes <br />Net Load Time per Truck: 1.504 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Minutes Adjusted for site altitude: <br />0.500 Minutes <br />Truck Load Time: 1.504 <br />Minutes Adjusted for site altitude: <br />1.504 Minutes <br />Truck Maneuver and Dump 0.90 <br />Minutes Adjusted for site altitude: <br />0.900 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm. smooth. rolling. dirt/lt. surfaced. watered. <br />maintained 3.0 <br />