My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-08_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2016-06-08_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:17 PM
Creation date
6/8/2016 1:47:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
6/8/2016
Doc Name
Review Memo & Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
RN7
Email Name
JLE
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOREHOLE SEALING WORK <br />Task description: Seal 7 wells <br />Site: Keenesburg Strip Mine Permit Action: RN7 <br />PROJECT IDENTIFICATION <br />Task H01 State: Colorado Abbreviation <br />Date: 6/8/2016 County: Weld Filename <br />User: JLE <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Permit/Job#: C1981028 <br />None <br />H01 <br />Borehole <br />Sealing/Item <br />Description <br />Method <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />FPW1 <br />Portland cement <br />8 <br />60.5 <br />17.80 <br />bag <br />$11.00 <br />$195.80 <br />grout ( Bag, material <br />cost onl ...94 lb. ba_) <br />Water supply <br />Portland cement <br />8 <br />620 <br />183.05 <br />bag <br />$11.00 <br />$2,013.55 <br />well <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />DH96 <br />Portland cement <br />5 <br />55.58 <br />5.93 <br />bag <br />$11.00 <br />$65.23 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />DH122 <br />Portland cement <br />5 <br />55.25 <br />5.08 <br />bag <br />$11.00 <br />$55.88 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />SMW-2 <br />Portland cement <br />4.75 <br />97 <br />10.17 <br />bag <br />$11.00 <br />$111.87 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />AMW-1 <br />Portland cement <br />4.5 <br />58.5 <br />3.89 <br />bag <br />511.00 <br />$42.79 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />AMW-2 <br />Portland cement <br />6 <br />49 <br />8.47 <br />bag <br />$11.00 <br />$93.17 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />cut casing <br />Borehole <br />NA <br />NA <br />7.00 <br />EA <br />$3.47 <br />$24.29 <br />location/identification <br />marker (EA, material <br />cost only) <br />drill rig time <br />ATLAS COPCO <br />NA <br />NA <br />16.00 <br />EA <br />$188.59 <br />$3,017.44 <br />ROC D7-11,4.0 in. <br />water truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />16.00 <br />EA <br />$65.52 <br />$1,048.32 <br />time <br />Gal. <br />Job Hours: 16.00 Total Cost: $6,668.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.