Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Topsoil Long Term Spoil Area and Parcel 25 <br />Site: Keenesburg Strip Mine Permit Action: RN7 Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: E02 State: Colorado Abbreviation: None <br />Date: 6/8/2016 County: Weld Filename: E02 <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer:. NA <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />Cost Breakdown: Scraper Work Team Support Euuimnent Maintenance Euuipment <br />Total work team cost/hour: $2,252.53 <br />MATERIAL OUANTITIES <br />Initial volume: 123,965 CCY Swell factor: 1.060 <br />Loose volume: 131,403 LCY <br />Source of estimated volume: Est. area of LTSP and Parcel 25 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,850 lbs/LCY <br />Material description: Sand - Damp <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 28.63 LCY <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />100 <br />100 <br />100 <br />100 <br />Ownership cost/hour: <br />$148.54 <br />NA <br />$97.48 <br />$97.48 <br />$53.53 <br />$11.19 <br />Operating cost/hour: <br />$192.54 <br />NA <br />$103.60 <br />$103.60 <br />$56.72 <br />$31.27 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />0 <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />$0.00 <br />$10.74 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$40.86 <br />NA <br />$39.87 <br />$39.87 <br />$40.67 <br />$38.75 <br />Unit Subtotals: <br />$381.94 <br />NA <br />$240.95 <br />$251.69 <br />$150.92 <br />$81.21 <br />Number of Units: <br />4 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,527.76 <br />Support: <br />$492.64 <br />Maint: <br />$232.13 <br />Total work team cost/hour: $2,252.53 <br />MATERIAL OUANTITIES <br />Initial volume: 123,965 CCY Swell factor: 1.060 <br />Loose volume: 131,403 LCY <br />Source of estimated volume: Est. area of LTSP and Parcel 25 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,850 lbs/LCY <br />Material description: Sand - Damp <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 28.63 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />