My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-08_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2016-06-08_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:17 PM
Creation date
6/8/2016 1:47:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
6/8/2016
Doc Name
Review Memo & Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
RN7
Email Name
JLE
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Topsoil B -Pit <br />Site: Keenesburg Strip Mine Permit Action: RN7 <br />PROJECT IDENTIFICATION <br />Task #: E01 State: Colorado <br />Date: 6/8/2016 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer:. NA <br />Permit/Job#: C1981028 <br />Abbreviation: None <br />Filename: E01 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauinment Maintenance Eauinment <br />Total work team cost/hour: $2,175.80 <br />MATERIAL OUANTITIES <br />Initial volume: 172,562 CCY Swell factor: 1.060 <br />Loose volume: 182,916 LCY <br />Source of estimated volume: Est. B -Pit Area, Parcels 30, 31 and 32 (Areas not Phase 2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,850 lbs/LCY <br />Material description: Sand - Damp <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 28.63 LCY <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />100 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$148.54 <br />NA <br />$97.48 <br />$97.48 <br />$53.53 <br />$11.19 <br />Operating cost/hour: <br />$192.54 <br />NA <br />$103.60 <br />$103.60 <br />$14.18 <br />$7.82 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$40.86 <br />NA <br />$39.87 <br />$39.87 <br />$40.67 <br />$38.75 <br />Unit Subtotals: <br />$381.94 <br />NA <br />$240.95 <br />$240.95 <br />$108.38 <br />$57.76 <br />Number of Units: <br />4 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,527.76 <br />Support: <br />$481.90 <br />Maint: <br />$166.14 <br />Total work team cost/hour: $2,175.80 <br />MATERIAL OUANTITIES <br />Initial volume: 172,562 CCY Swell factor: 1.060 <br />Loose volume: 182,916 LCY <br />Source of estimated volume: Est. B -Pit Area, Parcels 30, 31 and 32 (Areas not Phase 2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,850 lbs/LCY <br />Material description: Sand - Damp <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 28.63 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.