Laserfiche WebLink
SITE RECLAMATION ACTIVITY <br /> APRIL 2015 TO MARCH 2016 <br /> Reclamation activity during the 2015 reporting year (April 2015 to <br /> March 2016) consisted of reclamation maintenance work and activity <br /> by others within the permit area. <br /> In the following sections of this report, environmental activity <br /> during the 2015 reporting year and activity within the permit area <br /> by others is discussed on a site by site basis . <br /> All four of the below permit areas have been included in the list <br /> for the proposed Bonita Peak Mining District NPL site . <br /> AMERICAN TUNNEL PORTAL AREA - Plate No. 1 <br /> During the 2015 reporting year, no additional acreage was disturbed <br /> or reclaimed by Sunnyside. With completion of work in 2006, all of <br /> the reclamation work in the reclamation plan had been completed. <br /> The two buildings and surrounding area that will remain after <br /> reclamation were occupied by tenants under an agreement with the <br /> current owner of the land and buildings . This area was actively <br /> being used by the owner. <br /> Reclamation and environmental activity during 2015 consisted of <br /> cleaning the American Tunnel drainage culvert and ditch. The <br /> sediment bags used to collect the precipitate from the culvert and <br /> ditch has been left on-site to dry to make transport and disposal <br /> feasible. <br /> Since the Gold King incident on August 5th, EPA has taken over the <br /> area to use as a staging area for their Gold King response and to <br /> build and operate a water treatment plant to treat the Gold King <br /> flows. As a result, a large portion of Sunnyside' s reclamation work <br /> has been disturbed. See the following pictures . <br /> 2 <br />