My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-02_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
2016-06-02_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 8:00:39 AM
Creation date
6/8/2016 11:19:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
6/2/2016
From
Sunnyside Gold Corp
To
DRMS
Annual Report Year
2016
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ )3I.Xlo w/topsoil mulched w/ 100 <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 131 2,4, fertilized w/ 131,)4replacement rate(tons): / t/u c <br /> apvd fertilizer: depth(in.): <br /> Seed I-ydro s,,x,l Fertilizer I414, s.Jarol Mulch Nydra PeAe e{ <br /> application a•�4 application 0...,el application ^01 <br /> method: gAvacicasi method: (?roAcYc C method: FfA -f h ro ,42f <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES 10 N/A <br /> If"YES",indicate the weed species,control area, control type,application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES NO CD <br /> If"NO",please explain: 11 11 __99 <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? 0110 NO N/A <br /> 19. Is your basis for legal right to enter still valid? NO <br /> 20. Does your permit require you to submit monitoring information annually? op NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.