Laserfiche WebLink
1110 <br /> IIF <br /> Exhibit A - Legal Description <br /> A 51 acre tract of land of which approximately 18.2 acres are <br /> located in the NE of the SW41 15.9 acres in the NA of the <br /> SA; 1 .0 acres in the SE4 of the SW4; and 15.9 acres in the <br /> SW1 of the SW 4 , all in Section 31-T23S-R56W of the 6th P.M. <br /> in Otero County, Colorado. <br /> Exhibit B - Index Map <br /> Please see an excerpt of the USGS 7.5 Minute Quadrants providing <br /> a composite map taken from maps identified as Rocky Ford and <br /> Hawley, Colorado and submitted as Exhibit B-1 . <br /> Exhibit C - Pre-mining and Mining Plan Maps <br /> Please see Exhibit C-I , the Pre-mining Map and Exhibit C-2, <br /> the Mining Plan Map submitted with this Application. <br /> Exhibit D Mining Plan <br /> This Application incorporates all of the area presently permitted <br /> as a Limited Operation, MLRB File #79-7 and all of the area <br /> included under a Special Operations Permit , MLRB File # M-85-179. <br /> In addition, another area of 31 acres is added to the above <br /> permitted areas creating a new Regular Operation application <br /> ' with a combined total of 51 acres. Conversion of the several <br /> permitted areas and related release of the posted sureties <br /> will be requested simultaneously with completion of the appli- <br /> cation process for the enlarged operation. <br /> Excluded from this Application is an adjacent 14.5 acre tract <br /> that has been permitted by Otero County for a permanent indust- <br /> rial site for a concrete and asphalt hot plant. At present the <br /> site is used as a stockpile area and blending operation for <br /> aggragate materials trucked to the site from Lamar, Colorado <br /> and other locations other than the immediately adjacent mining <br /> operation. The industrial site will continue to be used in <br /> the same manner long after the immediately adjacent resource is <br /> exhausted. The industrial site will be fenced separately. <br /> The proposed mining activity on the 51 acre tract will generally <br /> proceed in the same manner as presently permitted. The initial <br /> Limited Operation area has been nearly mined out and will become <br /> the first area planned for final grading and reclamation in 1986. <br /> A small portion of the area near its west boundary will continue <br /> to be used in the conduct of the mining and processing operation. <br /> Exhibit C-2, presents a five phased operation with each phase <br /> encompassing about 7 to 9 acres. Depending upon the demand for <br /> material , it is expected that each phase will be fully mined in <br /> two years from the start and late in the second year be graded <br /> and prepared for final reclamation . It shall be the goal of <br /> the mining plan to limit disturbance to approximately 10 acres <br /> at any given time. <br />