My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-07_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-06-07_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:12 PM
Creation date
6/7/2016 1:12:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/7/2016
Doc Name
Midterm & Cost Estimate
From
Janet Binns
To
Zach Trujillo
Type & Sequence
MT7
Email Name
JHB
ZTT
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
222 Mobilize/Demobilize Equipment for Yearly Site <br />Maintenance <br />MOBILIZE 1 12.22 $73,359.00 <br />223 Mobilize/Demobilize Equipment for Two Pond <br />Cleanings <br />MOBILIZE 1 8.44 $6,608.00 <br />230 Site Maintenance During Ten Year Liability Period SITEMAINT <br />ENANCE <br />1 800.00 $510,456.00 <br />231 Pump 15 Sediment Ponds Prior to Two Cleanings PUMPING 1 236.66 $26,648.00 <br />232 Clean 15 Sediment Ponds Two Times TRUCK1 1 668.30 $238,328.00 <br />233 Reseed Emergency Road to Power Pole with <br />GLMix (TR151 T002) <br />REVEGE 1 0.80 $221.00 <br />234 Regrade ETD Pond 1 DOZER 1 0.81 $218.00 <br />235 Replace Topsoil to Disturbance from Substations DOZER 1 0.72 $178.00 <br />236 Regrade Disturbance from Substations DOZER 1 0.51 $126.00 <br />237 Replace Topsoil on regraded ETD Pond 1 (TR104) DOZER 1 0.49 $131.00 <br />238 Reseed Substations with Grazing Land Mix <br />(MR142) <br />REVEGE 1 1.00 $276.00 <br />239 Reseed Geotechnical Hole Access Corridors <br />(MR143) <br />REVEGE 1 2.00 $1,256.00 <br />240 Broadcast Seed ETD Pond 1 Area REVEGE 1 1.00 $645.00 <br />241 Post-mining channel construction NA 1 1,120.96 $329,914.00 <br />401 Collom-Haul Topsoil from TS 24A to Area 2 <br />(249.14 acres) <br />SCRAPER1 3 130.94 $644,516.00 <br />402 Collom-Haul Topsoil from TS 25A to Area1 SCRAPER1 2 91.08 $159,626.00 <br />403 Collom-Haul Topsoil from TS 24A to Area 3 SCRAPER1 2 45.14 $79,120.00 <br />404 Collom-Haul Topsoil from TS 25B to Area 4 SCRAPER1 2 79.65 $265,834.00 <br />405 Collom-Haul Topsoil from TS 35A to Area 6 SCRAPER1 2 211.08 $704,490.00 <br />406 Collom-Haul Topsoil from TS 36A to Area 7 SCRAPER1 3 125.23 $322,741.00 <br />407 Collom-Haul Topsoil from TS 35A to Area 5 SCRAPER1 1 30.58 $29,363.00 <br />408 Collom-Haul Topsoil from TS 25B to Area 3 SCRAPER1 2 135.45 $237,387.00 <br />409 Collom-Haul Topsoil from TS 25A to Haul Road SCRAPER1 4 181.03 $604,188.00 <br />410 Collom-Haul Topsoil from TS 25A to Area 5 SCRAPER1 2 104.49 $186,474.00 <br />411 Collom-Haul Topsoil from TS 25B to Area 5 SCRAPER1 2 27.26 $47,771.00 <br />412 Haul Topsoil from TS 25B to Area 5 SCRAPER1 2 7.41 $24,732.00 <br />413 Collom-Haul Topsoil from TS 36A to Area 5 SCRAPER1 2 77.76 $136,275.00 <br />414 Haul Topsoil from TS 24A to LCX west SCRAPER1 2 33.25 $58,276.00 <br />415 Collom-Haul Topsoil from TS 25A to LCX east SCRAPER1 2 34.54 $60,531.00 <br />416 Collom-Haul Topsoil from TS 25A to DS pond SCRAPER1 1 11.96 $11,870.00 <br />417 Demolish/dispose of facilities at Collom expansion <br />area <br />DEMOLISH 1 60.00 $1,665,876.44 <br />418 Rip 290,000 ft. of Collom haul road RIPPER 2 107.35 $119,041.00 <br />419 Scarify subgrade 290,000 ft. of Collom haul road RIPPER 4 175.22 $386,258.00 <br />420 Collom-HR haul-back in balanced cut/fill areas <br />(Table 7) <br />SCRAPER1 4 343.76 $1,147,285.00 <br />421 Collom-Scraper haul from spoil pile -road <br />reclamation <br />SCRAPER1 3 159.89 $787,014.00 <br />422 Seed & reseed 290.45 acres disturbance <br />Shrub/Grass mix <br />REVEGE 1 290.45 $248,568.00 <br />423 Seed & reseed 1161.46 acres disturbance <br />Sagebrush/Steppe mix <br />REVEGE 1 1,161.46 $958,915.00 <br />424 Collom-Rough grade 1,452.25 acres reclaimed area <br />(Table 12) <br />GRADER 2 172.10 $67,708.00 <br />425 Collom-Haul topsoil from 25A to Sump area SCRAPER1 1 10.17 $9,769.00 <br />426 Haul topsoil from 25A to UCWD SCRAPER1 1 0.83 $801.00 <br />427 Little Collom Pond Removal DOZER 1 25.61 $6,388.00 <br />428 Collom Sump Removal DOZER 4 620.02 $618,456.00 <br />429 Regrade ditch D4 DOZER 1 2.95 $614.00 <br />430 Regrade ditch D5 DOZER 1 1.08 $225.00
The URL can be used to link to this page
Your browser does not support the video tag.