Laserfiche WebLink
Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 0.930 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.4477 <br /> <br />Adjusted unit production: 1,285.03 LCY/hr <br />Adjusted fleet production: 5140.12 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.408/LCY <br /> <br />Total job time: 6.31 Hours <br />Total job cost: $13,244 <br /> <br />