Laserfiche WebLink
Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 0.930 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.4477 <br /> <br />Adjusted unit <br />production: 1,285.03 LCY/hr <br />Adjusted fleet <br />production: 5140.12 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.408/LCY <br /> <br />Total job time: 3.65 Hours <br />Total job cost: $7,657 <br /> <br />