Laserfiche WebLink
Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 0.930 (CAT HB) <br />Material Weight: 0.894 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5590 <br /> <br />Adjusted unit <br />production: 872.04 LCY/hr <br />Adjusted fleet <br />production: 3488.16 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.621/LCY <br /> <br />Total job time: 132.65 Hours <br />Total job cost: $287,315 <br /> <br />