My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-07_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-06-07_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:12 PM
Creation date
6/7/2016 1:12:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/7/2016
Doc Name
Midterm & Cost Estimate
From
Janet Binns
To
Zach Trujillo
Type & Sequence
MT7
Email Name
JHB
ZTT
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 9000.00 2.50 3.00 5.50 1266 7.251 <br />Haul Time: 7.251 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 9000.00 -2.50 3.00 0.50 3503 2.790 <br />Return Time: 2.790 minutes <br />Total Truck Cycle Time: 13.521 minutes <br />Loading Tool unit <br />Production <br /> <br />4,603.46 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,820.87 <br /> <br />LCY/Hour <br />Truck Unit Production <br />776.15 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />644.20 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />6 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />8 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 5,153.63 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,641.74 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 2,907.47 Hours <br /> <br />Unit cost: <br /> <br />$1.259 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$27,979,105 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.