Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br /> <br />Task description: Load and Haul Spoil to Final East Pit (Subtract SL6, Sl7 & S <br />Site: Colowyo Coal Mine Permit Action: MT7 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado Abbreviation: None <br />Date: 3/24/2016 County: Moffat Filename: C19-006 <br />User: JHB <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: Cat D11T - 11U <br />-Dump Area: Cat D11T - 11U <br />Road Maintenance –Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 100 100 50 50 <br />Ownership cost/hour: $114.21 $344.26 $177.24 $177.24 $75.59 $64.74 <br />Operating cost/hour: $270.80 $506.11 $291.79 $291.79 $42.64 $67.43 <br />Ripper op. cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour: $22.10 $38.60 $38.89 $38.89 $35.83 $29.42 <br />Unit Subtotals: $407.11 $888.97 $507.92 $507.92 $154.06 $161.58 <br />Number of Units: 4 1 1 1 1 1 <br />Group Subtotals: Work: $2,517.41 Support: $1,015.84 Maint: $315.64 <br />Total work team cost/hour: $3,848.89 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 184,155 CCY Swell factor: 1.000 <br />Loose volume: 184,155 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br /> Material weight: 2,572 Pounds/LCY <br /> Description: User Provided <br /> Rated Payload: 492,200 Pounds <br />Payload Capacity: 191.37 LCY <br /> <br />