My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-07_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-06-07_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:12 PM
Creation date
6/7/2016 1:12:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/7/2016
Doc Name
Midterm & Cost Estimate
From
Janet Binns
To
Zach Trujillo
Type & Sequence
MT7
Email Name
JHB
ZTT
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />BLASTING MATERIALS QUANTITIES <br /> QUANTITY UNIT <br />Total Quantity of Stemming Required: 458.15 cubic yards <br />Total Quantity of Explosives Required: 376,420 pounds <br />Total Quantity of det. cord/fuse/wire Required: 56,815 linear feet <br />Quantity of Blasting Caps per Blasthole: 1 cap(s) <br />Total Quantity of Blasting Caps Required: 650 caps <br />Quantity of Primers per Blasthole: 1 primer(s) <br />Total Quantity of Primers Required: 650 primers <br />Quantity of Delays per Blasthole: 1 delay(s) <br />Total Quantity of Delays Required: 655 delays <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Description <br />Drilling Equipment - Drill: Atlas Capco DML/SP - 9-7/8” <br />-Drill Pad Preparation: Cat D11T - 11U <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery –Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: Cap Delivery Truck <br /> <br /> Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Equipment Preparation Support Support Bulk Truck Cap Truck <br /> Drilling Dozer MiscTruck MiscTruck <br />%Utilization-machine: 100 100 NA NA 100 100 <br />Ownership cost/hour: $91.48 $177.24 NA NA $67.53 $5.42 <br />Operating cost/hour: $181.39 $291.79 NA NA $85.10 $18.81 <br />Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Operator cost/hour: $60.05 $38.89 NA NA $22.10 $22.10 <br />Unit Subtotals: $332.92 $507.92 $0.00 $0.00 $174.72 $46.33 <br />Number of Units: 1 1 0 0 1 1 <br />Group Subtotals: $332.92 $507.92 $0.00 $0.00 $174.72 $46.33 <br />Total work team cost/hour: $1,061.89 <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting Agent: <br />Bulk ANFO nom. density <br />( 7,900-15,000 fps ) Pound $0.234 376420.236 $88,082.34 <br />Primers or Boosters: <br />Cast primer, 1.0 lb <br />(electric or non-electric <br />system) Each $3.299 650.000 $2,144.35 <br />Blasting Caps: <br />Non-electric cap, delay <br />(non-electric systems) Each $3.496 650.000 $2,272.40 <br />Det. Cord, fuse, or <br />wire: <br />Detonating cord, 25 <br />gr./ft. (non-electric <br />systems) Linear foot $0.140 56815.000 $7,954.10 <br />Delays: <br />MS connectors (non- <br />electric systems) Each $4.924 655.000 $3,225.22 <br />Miscellaneous: <br />Stemming, 1.5 in. gravel <br />(inert blasthole packing- <br />imported) Cu. yd. $27.244 458.150 $12,481.84 <br />Drill bits: Bit life = 1,750 Linear feet $2,738.47 20.911 $57,265.32 <br /> Total Materials Cost: $173,425.57
The URL can be used to link to this page
Your browser does not support the video tag.