Laserfiche WebLink
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Robert Randall, Interim-Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />June 2, 2016 <br /> <br />Mr. John Vasquez <br />Loloff Construction, Inc. <br />801 8th Street, Suite 130 <br />Greeley, CO 80631 <br /> <br />Re: Loloff Construction, Inc., Loloff Mine, File No. M-1985-112, <br /> Technical Revision No. 2 (TR-02), Incomplete Submittal <br /> <br />Mr. Vasquez: <br /> <br />The Division of Reclamation, Mining and Safety (Division/DRMS) received a Technical Revision <br />submittal to address the approval of the installation of a slurry wall at the Loloff Mine on June 1, 2016. <br />The revision submittal was deemed incomplete for purposes of filing for the following reasons; <br /> <br /> Insufficient payment of the $216.00 technical revision fee <br /> The submittal included preliminary slurry wall design drawings and draft slurry wall design <br />specifications. The Division is unable to review draft and/or preliminary drawings and <br />specifications for a technical revision. Please submit final drawings and design specifications for <br />Division review. <br /> <br />Please submit the required fee and documents within 30 days of the date of this letter. <br /> <br />If you have any questions, please contact me at (303) 866-3567 Ext. 8124. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Peter Hays <br />Environmental Protection Specialist <br /> <br />Cc: Wally Erickson, DRMS <br /> <br />