Laserfiche WebLink
To: Division of Reclamation, Mining and Safety <br /> From: Randy Schafer /20, <br /> 40586 Co. Rd. 21 <br /> Haxtun, CO 80731 <br /> 970-774-6264(Home),970-520-0502 (Cell), 970-854-3778 (Fax) <br /> Consultant for Tim Carper <br /> Tim Carper <br /> Owner/Operator of Carper Pit#2 (M-2008-072) <br /> 42538 Co. Rd.09 <br /> Haxtun,CO 80731 <br /> Date: May 30, 2016 <br /> RE: Technical Revision for Carper Pit#2 (M-2008-072) <br /> On behalf of Tim Carper,owner and operator,we are proposing the following technical revision to the <br /> Carper Pit#2(M-2008-072): <br /> 1) Carper Pit#2 is a total of 42.7 acres. The original mining plan was laid out in seven tracts. The <br /> mining plan stipulated that as a new tract was opened,the Division would be notified of the <br /> new area,and the necessary financial warranty would be posted before mining in the new area <br /> would occur. <br /> 2) The technical revision proposes the same concept except that new areas to be mined might be <br /> different sizes or shapes than originally proposed. <br /> 3) Mr. Carper is currently proposing to open a smaller,2-acre area. A map is attached showing the <br /> proposed 2-acre area. <br /> 4) Mr.Carper still acknowledges that when any new tract or phase is opened, regardless of size or <br /> position in the pit,that the Division will be notified,the area staked,and a new financial <br /> warranty calculated and required. <br /> 5) All mining an reclamation would still be performed as originally proposed. <br /> A check for$216 is enclosed. Please let me know if any additional information is needed to complete <br /> the technical revision. <br />