My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-02_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-06-02_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:24:58 PM
Creation date
6/3/2016 2:33:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
6/2/2016
Doc Name
Notices
From
DRMS
To
various
Type & Sequence
AR2
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br /> 15. On Site Processing: <br /> Solution(SO) LI Chemical(CH) n Thermal(TH) <br /> 151 Heap Leach(HL) n Vat Leach(VL) <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: Onsite processing also Includes a flotation <br /> and carbon-in-pulp mill.Sodium cyanide,dilute cyanide solution,hydroxide and hydrochloric acid,potassium amly xanthate,dithophoephate and frother <br /> are used in the benefication processes.A more complete discussion of these chemicals and usage in the high grade milli facilities,adsorption,desorption, <br /> Description of Amendment: and recovery facilities,and at the valley leach facilities is contained In the Project Description. <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s): <br /> Mine Life Extension 2 will provide additional mining in the Main Cresson Mine,the Wildhorse Extension of the East Cresson Mine,and the North <br /> Cresson Mine to include the extension of the Schist Island Mine area and the Globe Hill Mine area.Ore will be processed at new high grade mill facilities <br /> and at a new valley leach facility to be constructed in Squaw Gulch(SGVLF).The SGVLF will include an adsorption,desorption,and recovery facility. <br /> The East Cresson Overburden Storage Area wii be extended and the Squaw Gulch Overburden Storage Area wil be modified to accommodate the SGVLF. <br /> See the accompanying Project Description for additional information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.