Laserfiche WebLink
2) Depth to top of bedrock <br /> 3) Depth to bottom of key <br /> 4) Description of the bedrock. <br /> 3. Whenever tests conducted by the Slurry Trench Specialist indicate material or workmanship not in <br /> accordance with the specifications,work shall be halted and the cause of the discrepancy shall be <br /> identified.Work not in accordance with the specifications shall be removed, replaced,repaired,or <br /> otherwise corrected so as to conform to the specifications. <br /> 4. An as-built profile drawing of the trench bottom and backfill slope shall be continuously maintained <br /> by the Contractor.The profile shall indicate the extent of excavation and backfill at the end of each <br /> working day.The daily profile shall be drawn in an electronic format or by hand. <br /> SECTION CONTINUES ON FOLLOW! AGES <br /> <1( <br /> iCe <br /> 4c) . <br /> Loloff Slurry Wall 3156 00-11 <br />