Laserfiche WebLink
5/27/2016 <br /> Division of Reclamation, Mining and Safety <br /> Attn: Peter Hays <br /> 1313 Sherman Street <br /> Room 215 <br /> Denver, CO 80203 <br /> RE: Loloff Construction, Inc.-Loloff Pit—Technical Revision No. 2 Request <br /> File No. M-1985-112. <br /> Dear Mr. Hays: <br /> Loloff Construction, Inc. requests a revision to their existing permit to address the approval of the <br /> installation of a slurry wall at the Loloff Pit. The following items have been submitted for your review <br /> and/or comment: <br /> 1. Proposed Slurry Wall Alignment: A proposed slurry wall alignment with bore locations and a <br /> profile of the wall design has been submitted for your review and comment. <br /> 2. Proposed Earthworks Specifications: A proposed design and construction specification for the <br /> earthworks have been submitted for your review and approval. <br /> 3. Proposed Slurry Wall Specifications: A proposed design and construction specification for the <br /> slurry wall have been submitted for your review and approval <br /> The final design of the slurry wall is near completion pending any comments or concerns from your <br /> office. Loloff Construction, Inc. appreciates your consideration of this request and looks forward to your <br /> response. <br /> Thanks in advance for your assistance, and feel free to contact me at 970-217-9965 or email me with <br /> comments or concerns. <br /> Best Regards, /, <br /> John S.Vazquez, . <br /> Attachments: <br /> Slurry Wall Design Plans <br /> Earthworks Specifications <br /> Slurry Wall Specifications <br />