Laserfiche WebLink
License Agreement No. <br /> RMR—LI—2005-39 <br /> UNITED STATES OF AMERICA <br /> , DEPARTMENT OF ENERGY <br /> WESTERN AREA POWER ADMINISTRATION <br /> Hayden-Vernal 138-kV Transmission Line <br /> S2 NW4 Section 13,Township 6 North,Range 91 West <br /> 6th Principal Meridian,Moffat County,Colorado <br /> Vicinity of Structures 111/3& 111/2 <br /> LICENSE AGREEMENT <br /> THIS LICENSE AGREEMENT is made this -67 day of ���t—� ,2005,between DURAN&p �e <br /> CONTRACTORS(LICENSEE),whether one or more,and the UNITED STATES OF AMERICA,Department of Energy,Western <br /> Area Power Administration(Western),represented by the officer executing this agreement,pursuant to the Reclamation Act,Act of <br /> June 17, 1902,32 Stat.388,and acts amendatory thereof and supplementary thereto,and the Department of Energy Organization Act, <br /> Act of August 4, 1977,91 Stat. 565. <br /> WITNESSETH: <br /> Western concurs that the mining of gravel(FACILITY),proposed by the LICENSEE will not interfere with the operation and <br /> maintenance of the Hayden-Vernal 138-kV Transmission Line,if constructed in the manner and at the locations shown on Exhibit A, <br /> attached hereto and made a part hereof. <br /> In consideration of Western's concurrence,the LICENSEE agrees to the following: <br /> (a)This license does not grant any right,privilege, or interest in the land. The LICENSEE is responsible for obtaining any <br /> necessary land rights from the underlying landowner. <br /> (b)This license is only valid provided the FACILITY is constructed,operated,and maintained in conformance with the <br /> attached drawings and/or exhibits. Any relocations,changes,or upgrades require additional concurrence by Western. <br /> LICENSEE agrees to alter or relocate its FACILITY,at no cost to Western,to accommodate future modifications of Western's <br /> facilities,including but not limited to,upgrades of the transmission line. <br /> (c)Please note that the easement width is 75 feet(37.5 feet each side of the centerline). Operation and maintenance of the <br /> transmission line requires that Western use heavy equipment within the easement area,therefore,Western will not be held <br /> liable for damages to the FACILITY should they occur. <br /> (d)LICENSEE shall notify Western at least 10 business days prior to commencing installation of the FACILITY to permit <br /> inspection by Western. Contact Dave Tiede in our Craig Office,(970)824-8877. <br /> (e)To abide by and comply with all applicable Federal,State,and local laws and building and safety codes. <br /> (f)Induced voltages and currents may occur on the FACILITY constructed or placed under or near high voltage transmission <br /> lines. The LICENSEE shall be responsible for the protection of personnel and equipment in their design,construction, <br /> operation and maintenance of the FACILITY described in this License Agreement. <br /> (g)It is specifically understood and agreed that the United States shall have no liability and the United States assumes no <br /> responsibility for any liability,loss and/or damage resulting from injury or death of persons whomsoever,or damage to, loss, <br /> or destruction of property whatsoever,when such liability,injury,death,loss or damage results from or in connection with the <br /> use of Western's easement area by LICENSEE. <br /> (h)This agreement shall be binding on the successors or assigns of the LICENSEE and Western. <br /> (i)A minimum overhead clearance of at least 14 feet from the conductors must be maintained at all times. <br /> LICENSEE THE UNITED STATES OF AMERICA <br /> Mr.Jim Duran Western Area Power Administration <br /> Duran&,Eie c-is`contractors <br /> PO Box 1331 <br /> Craig,CO 81626 <br /> (Signature �� /✓ Jim omsicv �� <br /> Montrose Maintenance Manager <br /> Rocky Mountain Region <br /> (Title) <br />