Laserfiche WebLink
CMC—Henderson Operations <br /> DRMS 2015 Annual Water Monitoring Report <br /> May 2016 <br /> Executive Summary <br /> This report provides a summary of the 2015 water monitoring data collected pursuant to the <br /> Climax Molybdenum Company (CMC) — Henderson Operations (Henderson) Technical <br /> Revision 16 (TR-16) to Permit M-1977-342 Groundwater Management Plan (GWMP). The <br /> Henderson GWMP was approved by the Division of Reclamation, Mining and Safety(DRMS) in <br /> July 2012. The focus of this report is 2015 data, however, historical data is included from the <br /> 2012-2014 monitoring periods to allow for the assessment of trends over time. Sampling was <br /> conducted at the required locations in accordance with the GWMP and each sample was <br /> analyzed for the required parameters. <br /> In a memorandum dated April 14, 2015, the DRMS preliminarily accepted new proposed <br /> Numeric Protection Limits (NPLs) for indicator parameters at Mill Point of Compliance (POC) <br /> locations. As such, this report takes into consideration these new NPLs. <br /> Mine Water Monitoring <br /> While no deviations were seen in the regularly scheduled triannual DRMS sampling efforts, <br /> Henderson did receive pH values below the NPL limits in December of 2015 during monthly <br /> monitoring. On December 29th, 2015, in accordance with Section 5.3 of the Henderson <br /> Groundwater Management Plan, a letter (CMC, December 2015) was sent to the DRMS <br /> explaining the details of this groundwater NPL exceedance. Henderson will be submitting a <br /> separate Mine Groundwater Quality Assessment Update Memo to provide more detail on the <br /> 2015 monthly sampling efforts and plans for continued evaluations of the groundwater system <br /> dynamics in the area of the MNGW-1 well. Henderson anticipates submitting this memorandum <br /> to DRMS in June, 2016. <br /> Aside from the low pH level described above, there were no other deviations from established <br /> NPLs observed at the Mine POC well. <br /> Mine water monitoring data for POC well MNGW-1 and non-POC long-term surface water <br /> locations BG-20, CC-10 and CC-30 are included in this report and presented both in a table and <br /> trend evaluation graphs. <br /> Mill Water Monitoring <br /> There were no deviations from established NPLs observed at Mill POC wells. <br /> Mill water monitoring data for POC wells MLGW-ACR, MLGW-7, MLGW-15 and MLGW-17 <br /> and non-POC long-term surface water monitoring locations WFR-20 and WFR-40 are included <br /> in this report and presented both in a table and trend evaluation graphs. <br /> 3 of 8 <br />