Laserfiche WebLink
ANNUAL REPORT FOR WORK YEAR 2015 <br /> Work at mine consisted of ten days spent core drilling from inside the charlene tunnel July 10 thru <br /> August 20`h.Three pickup load of ore was hauled from the mine to mill site at my ranch at this time. <br /> Four tons of ore was crushed and sluiced at millsite in June 2015 .Weeds were spot srayed over the <br /> summer at both sites <br /> May 27, 2016 <br /> JAMES POTTS <br />