My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-19_PERMIT FILE - C1982056 (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-05-19_PERMIT FILE - C1982056 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:22:19 PM
Creation date
6/2/2016 8:12:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
5/19/2016
Doc Name
Pad, Road and Exhauster Deigns
Section_Exhibit Name
Exhibit 49EE - 9 East Utility Borehole
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Twentymile Coal, LLC <br />SOW — 9 East Bleeder Exhauster Borehole <br />August 6, 2015 <br />OVERVIEW <br />Twentymile Coal (TC) will be installing two (2) boreholes. One borehole will accommodate a 16" OD, schedule 80, weldable or <br />T&C steel pipe. The second borehole will accommodate both a 6-5/8" OD and a 3.5" OD, schedule 80, weldable or T&C steel pipes. <br />Each of the two boreholes shall include a 60' long, grouted surface conductor as needed. The boreholes shall be drilled as noted in the <br />General Scope of Work section noted below. TC shall provide the casing pine. <br />All Bidders' proposals shall include: <br />• A detailed description of all work the Contractor is intending to perform, <br />• A schedule detailing Contractor's plan to complete the project within TC's project timing, and <br />• An itemized bid including all major categories of the proposal. <br />LOCATION <br />The TC mine site is located approximately 9 miles north of Oak Creek, Colorado, on Routt County Road #27. <br />Tile access road to the shaft site is located off Routt County Road # 179, approximately 4 miles northwest of the intersection of Routt <br />County Road #33 and #179. From this point, a 1.7 -mile long dirt road leads to the borehole site — final drill site to be determined. <br />PROJECT TIMING <br />The projected dates and timing for the project follow: <br />Submit Responsibilities, Specifications and Scope of Work to Contractors <br />2. Bids Due to Peabody Purchasing <br />3. Award contract, pending MPA & Contract process <br />4. Commence Mobilization, pending permit approvals <br />5. Commence Rig Setup and Drilling <br />6. Complete Drilling <br />COMPLETION SCHEDULE <br />08/07/15 <br />08/21/15 <br />Spring 2016 <br />Spring 2016 <br />Spring 2016 <br />Spring 2016 <br />TC reserves the right for inspection of all work according to the following specifications and scope of work provided herein with this <br />document. All scope of work questions shall be directed to Mike Berdine at (970)-870-2782 or Jon Bobbera at (970)-870-2789. <br />A schedule shall be submitted with the Contractor's proposal that accurately defines the Contractors required timing to <br />secure materials and complete the project. The Contractor shall identify any potential problems that may interfere with the <br />Contractor's ability to mobilize immediately after receiving the purchase order from TC to proceed. <br />Bleeder Exhauster BH SOW 9 East 080615.doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.