Laserfiche WebLink
TABLE 49A <br /> Soil Stockpile Summary <br /> STOCKPILE ID CURRENT VOLUME VOLUME TO BE ADDED TOTAL VOLUME <br /> CY CY) (CY <br /> FC13-1 7,400 0 7,400 <br /> FCB-2 350 0 350 <br /> FCB-3 150 0 150 <br /> FCVF-1 350 0 350 <br /> SSS-1 2,000 0 2,000 <br /> RDT-1 800 0 800 <br /> W WTF-1 4,000 0 4,000 <br /> SF-1 54,850 0 54,850 <br /> SF-2 55,850 0 55,850 <br /> SF-3 109,400 300 109,700 <br /> SF-4 3,650 0 3,650 <br /> SF-5 700 1,450 2,150 <br /> SF-6 152,750 450 153,200 <br /> SF-7 38,700 0 38,700 <br /> SF-8 4,100 0 4,100 <br /> SF-9 5,800 0 5,800 <br /> SF-10 350 0 350 <br /> SF-11 100 0 100 <br /> SP SP-1 6,300 100 6,400 <br /> SPSP-2 4,150 0 4,150 <br /> SF-12,13,14 20,000 0 20,000 <br /> SF-15 0 800 800 <br /> SF-16 0 2,200 2,200 <br /> SF-17 0 900 900 <br /> CRDA-S1 and S2 131,800 185,400(21 317,20012) <br /> TOTAL 603,550 191,600 795,150 <br /> EASTERN AND NORTHERN MINING DISTRICTS <br /> I ORT Dewatering Borehole 7,200 250 7,450 <br /> l ORT Dewatering Treatment 0 6,300 6,300 <br /> Pond(includes access road) <br /> EMD Ventilation Site 4,750 0 4,750 <br /> 7 North Escape Shaft 2,200 0 2,200 <br /> MC Shop to FC Tipple 12,800 0 12,800 <br /> NMD Power Borehole& 0 5,700 5,700 <br /> Road <br /> Ventilation Shaft&Road 0 2,550 2,550 <br /> 18RT Shaft&Road(') 0 6,600 6,600 <br /> 6MN Shaft,Road,& 0 23,700 23,700 <br /> Reservoir(4) <br /> 19RT Borehole/Pipeline 0 6,050 6,050 <br /> 5MN Cement Borehole 0 6,550 6,550 <br /> TOTAL 26,950 57,700 84,650 <br /> WESTERN MINING DISTRICT <br /> 18Lft Shaft&Road 0 13,550 13,550 <br /> WMD Stab.Borehole 0 2,600 2,600 <br /> 17LT Rockdust Install. 0 4,000 4,000 <br /> 15LT Vent Shaft 0 5,600 5,600 <br /> 16LT Utility Borehole 0 10,900 10,900 <br /> 13LT Utility Borehole 0 8,230 8,230 <br /> TOTAL 0 44,880 44,880 <br /> WOLF CREEK RESERVE <br /> 9E and l0E Boreholes 0 13,780 13,790 <br /> TOTAL 0 13,790 13,790 <br /> (1) Soil from Stockpiles SF-12 and 13 has been relocated to Stockpiles CRDA-S1 and S2 <br /> (2) For CRDA S 1 and S2,the volume to be added will be direct handled or placed in a future stockpile(s) <br /> (3) The volume listed for the 18RT Shaft/Roads is split among four stockpiles, roughly 40/30/15/15 percent beginning at <br /> the shaft pad and running back along the access road to the stock-pond location. Locations are shown on Map 29. <br /> (4) The volume listed for the 6MN Shaft, Roads, and Reservoir is split among four stockpiles, roughly 40/30/15/15 <br /> percent, beginning at the shaft pad stockpile and running back along the access road to the NW Mains Vent Shaft. <br /> Locations are shown on Map 29. <br />