My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-01_REVISION - M1994092
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994092
>
2016-06-01_REVISION - M1994092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:32 AM
Creation date
6/1/2016 11:26:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994092
IBM Index Class Name
Revision
Doc Date
6/1/2016
Doc Name
Notice of Surety Increase
From
DRMS
To
Rocky Mountain Excavating, LLC
Type & Sequence
SI1
Email Name
TC1
WHE
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: <br />Site: <br />Iron Mountain Road Gravel <br />Pit <br />Permit Action: <br />SO-2 Revised Permit/Job#: M1994092 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 100 State: Colorado Abbreviation: None <br />Date: 5/17/2016 County: Fremont Filename: M092-100 <br />User: TC1 <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />110 Backfill/Re-grading (3 300-CY Piles) DOZER 1 2.88 $483.00 <br />120 Topsoil Replacement DOZER 1 14.40 $2,412.00 <br />130 Revegetation of 7.33 Acres REVEGE 1 10.00 $9,991.00 <br />140 Mobilization MOBILIZE 1 3.54 $1,118.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />30.82 <br /> <br />$14,004 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $282.88 <br />Performance bond: 1.05 Total = $147.04 <br />Job superintendent: 20.38 Total = $1,517.90 <br />Profit: 10.00 Total = $1,400.40 <br /> TOTAL O & P = $3,348.22 <br /> CONTRACT AMOUNT (direct + O & P) = $17,352.22 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $867.61 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $4,215.83 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $18,219.83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.